•  

    (+234) 803-455-1417

  •  

    info@egbaclamp.com

Boring Operation

Boring Operation

Pipe cutting for clamp fabrication

Splitting of pipes into two equal halves

Cutting of sqare bar for clamp arm fabrication

Drilling of arm

Tack-welding of split pipe

Completed weld ready for MPI

Magnetic particle test

Fixing of seal

Depressurising

Surface preparation before coating

Clamping of vessel with 1.5 inches dia hole as leak

Milling of the Side Seal Seat

Completed Egba Split Clamp

Magnetic particle inspection (MPI)

Magnetic particle inspection (MPI)

Radiography

Completed Egba Tee Clamp

Completed Egba Tee Clamp